Abstract
In this paper it was proposed to use the PSO algorithm to estimate the time interval of the Cox process. The results of the proposed method of estimation were compared with the maximum likelihood estimator of estimating the rate of occurrence. The research included a realistic application in which the successive operating periods between two consecutive stops of the raw material mill in per day (from the General Company for Northern Cement / Cement Badush new plant) during the period from 1/4/2018 to 31/1/2019. The average time for machine operating periods was estimated by the methods proposed for use in the research.
Keywords
Cement plant
Cox process
maximum likelihood estimator
PSO algorithm
Abstract
تم في هذا البحث اقتراح استخدام خوارزمية PSO لتقدير المعدل الزمني لحدوث الحوادث لعملية Cox، وتم مقارنة نتائج الطريقة الذكائية المقترحة للتقدير مع طريقة الإمكان الأعظم لتقدير المعدل الزمني للحدوث. وتضمن البحث تطبيقاً واقعياً تناول فيه فترات التشغيل المتتالية بين توقفين متتالين لطاحونة المواد الاولية بالايام من (الشركة العامة لاسمنت الشمالية/ معامل سمنت بادوش الجديد) خلال الفترة من 1/4/2018 الى 31/1/2019. كما تم تقدير المعدل الزمني لفترات تشغيل الماكنة بالطرائق المقترحة للاستخدام في البحث
Keywords
عملية Cox، خوارزمية PSO، مقدرالامكان الاعظم، معمل سمنت